
Rayyana Heights
Pangani, Nairobi
A high-rise residential development delivered with structural precision, programmed to keep neighbouring occupancy undisturbed throughout the build.
Atis Building, 3rd Floor Suite 302, Eastleigh (Opp. BBS Mall), Nairobi
Our projects
Partnering with leading developers and architects to transform ambitious blueprints into durable, functional and striking structures built to last for generations.
Featured work
Filter by status or project type. Hover or tap a card to read how the project was delivered.

Pangani, Nairobi
A high-rise residential development delivered with structural precision, programmed to keep neighbouring occupancy undisturbed throughout the build.

Parklands, Nairobi
A contemporary mixed-use tower combining refined façade detailing with hard-wearing, low-maintenance material selections.

Parklands, Nairobi
Apartment development coordinated end-to-end, from substructure works through to services integration and handover.

Pangani, Nairobi
A landmark tower programme managed under a single point of accountability across trades, materials and site logistics.

Pangani, Nairobi
Phase two of the Crossroads programme, sequenced to reuse proven details and shorten the delivery curve.

Karen, Nairobi
A private family residence built to bespoke architectural detail with a curated interior finish package.

Mombasa
Coastal apartment development with specification choices tuned for humidity, salt exposure and long-term durability.

Eastleigh, Nairobi
Dense urban development delivered on a constrained site with tightly choreographed material deliveries.

Eastleigh, Nairobi
Serviced-style suites built for rental performance, with finishes chosen for turnover speed and durability.

Pangani, Nairobi
Residential apartments delivered with disciplined cost control and staged quality inspections at every level.

Pangani, Nairobi
Repeat-client development where standardised details and a familiar site team compressed the programme.

Donholm, Nairobi
Second Ubeyd block progressing alongside the homes scheme, sharing site plant, supervision and quality checks.

Eastleigh, Nairobi
A prominent Eastleigh development delivered with a strong street presence and hard-wearing public-facing finishes.

Donholm, Nairobi
Family apartment scheme in Donholm currently progressing through structure and envelope works.

Eastleigh, Nairobi
Mixed-use build on a busy Eastleigh street, sequenced around live trading and constrained access.

Eastleigh, Nairobi
Residential and retail development under active construction with staged quality inspections at each level.

Eastleigh, Nairobi
Residential phase of the Tamaam programme, built on proven details from earlier phases.

Lang'ata, Nairobi
Low-rise homes delivered with bespoke architectural detailing and a curated finish package.

Pangani, Nairobi
Apartment development coordinated across structure, services and fit-out under one contract.

Eastleigh, Nairobi
Commercial extension of the 7th Street programme, focused on lettable floor efficiency.
30+
Projects
15+
Complete projects
10+
Ongoing projects
5+
New projects
Capability
Every machine on the register is FIIDE-owned — maintained in-house and mobilised to site as the programme demands, so works never stall waiting on hired plant. Below is our own equipment, photographed on live FIIDE sites.

Concrete mixer
Owned
Excavator
Owned
Walk-behind road roller
Owned
Bar bending machine
Owned
Welding machine
Owned
Metal cutting machine
Owned
Angle grinder
Owned
Water pump
Owned
Service van
OwnedFIPL-PM-001
Concrete Mixer Machine
FIPL-PM-002
Asphalt & Concrete Cutting Machine
FIPL-PM-003
Aluminium & Metal Scaffolding
FIPL-PM-004
Welding Machine
FIPL-PM-005
Gas Cutting Machine
FIPL-PM-006
Metal Cutting Machine
FIPL-PM-007
Hand Cutting Machine (Wheel Type)
FIPL-PM-008
Jackhammer
FIPL-PM-009
Compactor Machine (Medium)
FIPL-PM-010
Serves Pump (A/C)
FIPL-PM-011
Vacuum Pump
FIPL-PM-012
Metal Bending Machine
FIPL-PM-013
Transport (Double Cabin Pickup & Van)
FIPL-PM-014
Laser Level Machine
FIPL-PM-015
Dumpy Level
FIPL-PM-016
Crane Machine

Repeat clients
Phase two, the next block, the fit-out, then the maintenance contract. Developers stay with FIIDE because the second project is faster than the first — the details are proven, the team already knows the standard, and the reporting is already in place.
Start a conversation
Share your drawings, site details or budget range and our team will come back with practical next steps — no obligation.